To ensure a seamless, efficient, and safe window/door installation, we kindly request that you review the following on-site preparations prior to our team’s arrival:
-
Clear Access: Ensure all pathways, corridors, and exterior access routes leading to the structural openings are completely unobstructed.
-
Remove Obstructions: Temporarily remove all existing window furnishings—such as blinds, curtains, and shutters—and move nearby furniture at least 1.5 to 2 meters away from the work zone.
-
Safety & Power: Ensure a reliable source of onsite power is accessible for structural tools.
Your dedicated project coordinator will issue a detailed pre-installation checklist customized to your site logistics several days before the scheduled date.