We follow a streamlined, 5-step engineering and production workflow to ensure zero-discrepancy execution:

  1. Initial Quote: Provide your approximate architectural dimensions and design preferences, and we will issue a preliminary quote.

  2. Deposit & Precision Measurement: Upon alignment on the quote, a deposit invoice is issued. We then request final, millimeter-accurate site measurements from either your own structural installer or our designated local partner.

  3. Shop Drawing Sign-Off: Our technical department drafts detailed shop drawings confirming all profiles, glazing specs, hardware configurations, and exact dimensions for your final engineering sign-off.

  4. Manufacturing: Once signed off, your order enters our automated production line with a standard fabrication lead time of 18 working days.

  5. Quality Verification & Logistics: Upon completion, we provide comprehensive product imagery for your quality check. The final balance is then invoiced, and shipping/delivery logistics are finalized.

 We use cookies to provide you with a better online experience, analyse and measure website usage, and assist in our marketing efforts.